2KM HIGH VOLTAGE CABLE INSTALLATION - LONDON
CableworX successfully completed the installation of approximately 2km of high voltage cable through London, Co-ordinating the cable pull through a busy urban environment while maintaining a safe and reliable installation throughout.




RESIDENTIAL INSTALLATION - SUFFOLK
CableworX completed a series of new residential electrical connections, 45 homes and 10 street lights all connected to the mains cable, installation of all service cables and cut-outs, testing and compliance labelling.
The works were delivered to a high standard to ensure a reliable and safe network, ready for our client to handover to the developer.




4MVA COMPLETE PROJECT - CAMBRIDGESHIRE
CableworX successfully delivered a complete 4MVA substation installation, comprising 4x 1MVA substations, 4x 1000A metering cubicles, 8x 400A Heavy duty cut-outs.
Our scope covered the full installation, including landing and positioning the switch gear and GRPs, installation of LV cables and terminations, installation of HV cables and terminations and installation and testing of substation earthing.
The entire project was successfully enegerised and handed over to our client ahead of schedule.








2.5MVA SUBSTATION INSTALLATION - LONDON
CableworX completed a 2.5MVA substation installation in the capital city of London, including the landing and positioning of the switchgear.
Our works included the installation of containment within the cable trough and dressing of 16x 800mm AWA cables, with all associated LV terminations completed.




Infrastructure Upgrade - Hertfordshire
CableworX successfully installed and upgraded the electrical infrastructure on behalf of our client.
Our scope included the installation of 24x 500mm AWA cables from the LV TX end to the customers LV panel. Drilling out gland plates, installation of cables, glanding and earthing.